The 6m³ builders' skip starts from R2,700, with delivery, a weekend or 2 to 3 day midweek hire, collection and disposal of accepted materials in the price. The 8m³ is there for bigger jobs.

Aerial view of a Cape Town suburb with a skip on a residential driveway

How much does a 6m³ take?

About 60-70 standard wheelbarrows. That is one complete bathroom tear-out including tiles and fixtures, or the rubble from knocking down a single interior wall, and it still fits a residential driveway. Past 70 wheelbarrow loads the 8m³ is better value. A 3m³ suits minor repairs or a single-trade job like replacing plumbing fixtures; the 8m³ is for full home renovations, roof replacements and multi-trade projects making waste for weeks. All four sizes are compared on the size comparison.

What can a building site put in?

  • Rubble: bricks, concrete blocks, paving stones, roof tiles, ceramics and mortar. Soil and sand under 20% of the load, because soil makes the skip too heavy to move safely.
  • Timber: floorboards, roof trusses, window and door frames. Painted wood is fine; creosote-treated railway sleepers are not.
  • Metal: steel beams, reinforcing rods, copper piping, roofing sheets and wire mesh.
  • Drywall: plasterboard offcuts, gypsum sheeting and ceiling boards. Wet or mouldy board is bagged separately.
  • Packaging: cardboard, plastic wrapping and builder's bags, kept under 10% of the load.
Ready to get started? Our team is standing by — call now for a free estimate.
📞 064 582 1436

What stays out?

Asbestos-containing materials, including old roof sheeting, vinyl floor tiles pre-1990 and pipe lagging, need licensed removal. Vermiculite insulation is out for the same reason. Paint tins, solvents, oils, chemicals and batteries cannot go in, and nor can tyres, mattresses or appliances. Garden refuse goes in its own load; the rubble page explains why mixing raises the disposal rate.

On the site, or on the road?

A skip on private property or a building site with boundary access needs no permit, as long as it does not block a public footpath or road drainage. A skip on a public road or verge needs the City's prior written permission before it is placed. The City's 2026/27 roads tariff book treats placing a container in the road reserve as temporary use of it. Overloading a 6m³ by even 10% can mean collection refusal, so load to the line we show you on delivery. The other sizes are on the price card.